Skip to content
Hexalogy++

Sector engineering

Sport & Performance

Clubs, federations and coaching staff: we deploy video analysis, match statistics and performance tracking — starting with beach volleyball.

  • Beach-volley
  • BVB Compostat
  • Performance

02 — Engineering practice

How we engineer for this sector.

Beach volleyball is a sport of extreme margins: two players, no substitutes, short rallies, and adjustments decided between points. Coaches and federations need a precise reading of every action — where points are won, where they are lost, which technical faults the opponent shows — to prepare matches and build high-performance programmes.

Our practice is built on BVB Compostat, a beach-volleyball video-analysis software designed and built with Hexalogy. Video — local file, YouTube, Google Drive, or web — is annotated with real-time score tracking and a comment on every action; play is broken down into four game types, the Composites, plus opponent technical faults, segmented into 20 game combinations; statistics read by team, player, and set.

We design for the actual workflow of a beach-volleyball staff: pre-match preparation, post-match review, and player follow-up across a tournament and the season. Analyses export as tables and as reports shareable with players, partners, and federations. Athlete data is processed in accordance with the UK GDPR.

03 — Engineering surface

The technologies behind this sector practice.

A selection of the platforms, standards, and tools our principals engineer with in this sector.

Video & Annotation

  • BVB Compostat
  • Local / YouTube / Google Drive / web video
  • Real-time score tracking
  • Comments per annotated action

Tactical & Performance

  • Composites (4 game types)
  • 20 game combinations
  • Opponent technical faults
  • Team & player statistics

Coach & Federation

  • Teams, players & tournaments
  • Integrated filters (player / set)
  • Table export & match reports
  • Windows · macOS · iOS · Android

Engage on this sector

Scope a sector engagement against your operating model.

Briefings are scoped within five working days and led by a senior architect with deep sector context.