Skip to content
Hexalogy++

Pharmaceutical · case study

Pharmaceutical Logistics

Engineering serialization, cold-chain telemetry, and supply integrity into a single GxP-aligned operational fabric.

Client · Global Pharma Operator

02 — Engineering execution

Context, execution, outcome.

The client manufactures temperature-sensitive biologics across 22 sites in Europe, the Americas, and Asia-Pacific. Serialization compliance was patched across disconnected systems; cold-chain excursions were detected hours after they occurred; and validation evidence for cross-border shipments required manual reconciliation against four different track-and-trace authorities. Operational shrinkage was visible only in the quarterly close.

We engineered a unified supply-integrity platform around GS1 standards and EPCIS as the canonical event model, integrated to the existing Werum PAS-X MES and Veeva Vault QMS. Cold-chain telemetry was instrumented through MQTT Sparkplug B gateways at every cold-storage and in-transit asset; anomaly detection runs continuously against the event spine; deviations trigger remediation workflows automatically. The full platform was validated under GAMP 5 / 21 CFR Part 11, with electronic signature and change-control engineered into the deployment pipeline itself.

Cold-chain shrinkage variance dropped 40% year-on-year, with the remaining excursions now detected and contained inside operational SLA. Regulator submissions across the four authorities draw from a single evidentiary surface — no more manual reconciliation. The platform now operates as the supply-integrity backbone for every new product introduction.

The supply-integrity platform now does what we always wished our patchwork of point solutions could do — detect what is happening, prove what happened, and remediate before it becomes a deviation. The shrinkage line on the close is finally an outcome we control.
AL

A. Lindqvist

Director of Global Supply Chain Operations

Scope a similar engagement

Discuss how this architecture maps to your operating context.

Briefings are scoped within five working days and led by a senior architect with deep context on this sector and engagement type.